Scandoil.com

Ithaca Energy completes extensive 3D seismic group shoot program in the North Sea


Published Jul 13, 2006
[an error occurred while processing this directive]

Edit page New page Hide edit links

Ithaca Energy completes extensive 3D seismic group shoot program in the North Sea-Spotlight

Ithaca Energy Inc.,an oil & gas company focused on the exploration and development of resources in the UK North Sea, has completed an extensive 3D seismic group shoot program covering licences it holds on Blocks 13/16b, 13/17 and 13/18 within the Outer Moray Firth area of the North Sea.

The 3D seismic program, was operated by PetroCanada (TSX:PCA) on behalf of itself, Nexen (TSX:NXY) and Ithaca, covered a total of 1,755.1 km², of which Ithaca’s share covered 300 km² for an expenditure of approximately USD$3.0 million. Ithaca’s program objective seeks to enhance the Company’s understanding of its Triton and Poseidon leads.

Triton and Poseidon are the two largest 2D seismic mapped leads in Ithaca’s exploration portfolio and are of a highly attractive stratigraphic play type, with large upside potential within the prospective Upper Jurassic Buzzard and Lower Cretaceous fairways. Independent consulting firm Gaffney Cline and Associates ("GCA"), in its report for the Company’s recent public offering, has ascribed gross unrisked recoverable Prospective Resources of between 50 to 500 million barrels of oil with a best estimate of 150 million barrels to Triton and gross unrisked recoverable Prospective Resources of between 50 to 400 million barrels of oil with a best estimate of 100 million barrels to Poseidon. Ithaca holds a 90% interest in Blocks 13/16b, 13/17 and 13/18 covering the leads.

The large ranges within GCA’s report signify the high level of uncertainty associated with these leads. GCA assessed each lead with a 10% geologic chance of success based upon the existing 2D data. Ithaca believes the newly shot 3D seismic survey will reduce this uncertainty and mitigate the risk associated with these leads.

Seismic data processing is expected to be completed by the end the 4th quarter of 2006 with interpretation, mapping and well locations determined by the end of the 1st quarter of 2007. Subject to the results of the data interpretation and rig availability Ithaca plans to drill a well to a depth of 2,150 m, or 30 m into the Jurassic in 2007.

Nick Muir, Ithaca’s Vice-President of Exploration, said:

"These exploration prospects, which are in addition to our range of near term development prospects, have very significant potential. The 3D seismic data is expected to greatly advance our understanding of the leads and result in suitable drilling locations." Nick Muir also added "We are delighted to have participated in what we believe was the largest 3D seismic group shoot in the area for several years."




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home