Scandoil  

Oilex completes plug milling operations


Published Jul 15, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex - Cambay-77H Well

Oilex Ltd has completed plug milling operations. Cambay-77H started unaided controlled flowback with gas observed at surface while successfully milling out 4 isolation plugs, including 1 that failed to seal properly.

Since the previous update on 7 July 2014:

The isolation plugs were successfully milled 8 fractures into the reservoir were connected to the well bore The well started to flowback unaided under controlled conditions during milling Gas flowed to surface during milling operations Production testing equipment was positioned and commissioned

Tags: Oilex Ltd




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml