Oilex Ltd has commenced the Cambay-77H production test on 04 November 2014. Instrumentation has been successfully deployed down hole and will record pressure data for the duration of the test. Upon completion, the instrumentation will be recovered and the data downloaded for analysis.
The test is focused on acquiring long term performance data which is essential for assessment of reservoir properties and will supplement surface data collected during flowback. A 5 day shut-in period preceded the test to allow the well to stabilise after ~ 85 days of flowback production.