Scandoil  

InterOil Corporation prepares to set seven-inch casing in the Raptor-1 well


Published Oct 2, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

InterOil Corporation

InterOil is preparing to set seven-inch casing in the Raptor-1 well in PPL 475 in the Gulf Province of Papua New Guinea. The casing point is slightly above the Kapau Limestone target zone, and is in line with the well program.

At this stage, calcimetry, temperature and background hydrocarbon concentrations are similar to those experienced before InterOil entered the Antelope reservoir. The significance of these preliminary indications can be determined only by further drilling and logging.

Raptor-1 is about 12km west of InterOil's multi-trillion cubic feet Elk-Antelope gas field.

Tags: InterOil Corporation




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml