|
Oil
Noreco produced 4 353 boe per day in January 2015Feb 9, 2015Huntington production in January has been stable but restricted to approximately 1 500 bopd net to Noreco. While the CATS
Spectrum commences new offshore 2D multi-client seismic projectFeb 9, 2015Spectrum has commenced a 12,000 km Multi-Client 2D seismic survey offshore the Pelotas Basin of Brazil.
Petrolia Norway plugs and abandons Zulu exploration well as gas discoveryFeb 9, 2015Petrolia Norway AS, a 100% subsidiary of Petrolia SE, has completed drilling of wildcat well 26/10-1. The well investigated the
EQT Corporation proved reserves increase 29%Feb 6, 2015EQT Corporation reported year-end 2014 total proved reserves of 10.7 Tcfe. This represents a 2.4 Tcfe net increase over 2013, with
Petro One Energy report their first horizontal well is on productionFeb 6, 2015Petro One Energy Corp. reports that Well 6-22, its first horizontal well drilled in the upper Viking, was completed as planned and has
Archer Petroleum to participate in horizontal well in Runnels County, TexasFeb 6, 2015Archer Petroleum Corp. has signed a participation agreement to participate in the drilling of the Clayton No. 1H, a horizontal well.
Marquee Energy reports significant increase in reservesFeb 6, 2015Marquee Energy Ltd. announce the results of its independent reserve evaluation as of December 31, 2014, which includes a 39% increase
INPEX commences oil production from Nasr oil field Offshore Abu DhabiFeb 6, 2015Inpex Corporation , through its wholly-owned subsidiary, Japan Oil Development Co., Ltd. (JODCO), has commenced oil production from the Nasr Oil Field offshore Abu Dhabi, the United Arab Emirates, on January 24, 2015.The Nasr Oil Field is located approximately 130km northwest of Abu Dhabi City. INPEX has jointly developed the Nasr Oil Field with
Mosman to commence flow testing following positive technical report resultsFeb 5, 2015The Directors of Mosman Oil and Gas Limited update shareholders in respect to operational activity as follows: The Company has now received the latest technical
Vital Energy prepares two horizontal wells for production, applies for two moreFeb 5, 2015Vital Energy Inc. announces the following status update: Pennant Area, S.W. Saskatchewan: The previously announced 2 horizontal well locations at
LGX Oil + Gas announces results of successful 2014 drilling programFeb 5, 2015LGX Oil + Gas Inc. provides completion results from late 2014 southern Alberta drilling activity. LGX drilled two horizontal wells into
Beach Energy shuts in Geoffrey-1 well in ATP 855Feb 5, 2015Icon Energy Limited provided an update on the Stimulation and Flow testing program in ATP 855 in the Cooper-Eromanga Basin in
TransAtlantic Petroleum announces preliminary 2015 capital expenditure budgetFeb 5, 2015TransAtlantic Petroleum Ltd. announced a corporate update, a preliminary 2015 capital expenditure budget and an update on its operations.
Rose Petroleum reports successful Mancos drilling programmeFeb 4, 2015Rose Petroleum is pleased to provide an operational update on the current activities taking place within both its oil and gas and mining divisions.
Petrobras discovers oil at third extension well in Sergipe BasinFeb 4, 2015Petrobras has confirmed the extension of the light oil and gas discovery, as announced to the market Aug. 9, 2013, by drilling
CNOOC's Jinzhou 9-3 project commences productionFeb 4, 2015CNOOC Limited says that its Jinzhou 9-3 comprehensive adjustment project has commenced production.The Jinzhou 9-3 oilfield is located in the North Liaodong Bay
Petroneft reports successful operations at License 61Feb 4, 2015The horizontal segment of the Tungolskoye No. 5 well has been drilled and completed in the J1-1 and J1-2 Upper Jurassic intervals.
Searcher announces 2015 GroupSeis campaignFeb 4, 2015Searcher Seismic, in conjunction with project partner BGP, are pleased to announce the 2015 GroupSeis campaign over the
Strata-X Energy Blue Spruce #1 well testing advancesFeb 4, 2015The directors and management of Strata-X Energy Ltd. announce that the completion testing of the Blue Spruce #1 well on the
Gran Tierra Energy announces year-end reservesFeb 4, 2015Gran Tierra Energy Inc. announced the results of an independent reserve evaluation of the company's reserves by Gran Tierra
Polyard Petroleum successfully tested Polyard-2 wellFeb 3, 2015Polyard Petroleum International Group Limited says that the Polyard-2 Well of SC49 project in the Philippines successfully completed oil
Roxi reports proposed sale of the Galaz contract areaFeb 3, 2015Roxi is pleased to update the market with news of progress concerning the possible sale the Galaz Contract Area in which it holds an interest
Junex starts a longer production test at its Galt No. 4 horizontal wellFeb 3, 2015Junex Inc. says that, since shutting-in the well for pressure build-up about one week ago, technical data was collected at the surface as to
Madalena Energy provides an operations updateFeb 2, 2015Madalena Energy Inc. provides the following operational update: On January 28, 2015, Madalena was advised by Keyera Corp. that Keyera's Paddle River gas plant will
|