Scandinavian Oil-Gas Magazine

http://www.scandoil.com/moxie-bm2/oil/exploration/strike-energy-continues-testing-operations-in-pel-.shtml

Strike Energy continues testing operations in PEL 96

Strike Energy Limited declares planning for the continued testing operations at the Le Chiffre 1 and Klebb 1 wells in PEL 96 (STX 66.7% (Operator)

[an error occurred while processing this directive]

Edit page New page Hide edit links

Strike Energy Limited-2

Strike Energy Limited declares planning for the continued testing operations at the Le Chiffre 1 and Klebb 1 wells in PEL 96 (STX 66.7% (Operator) and Energy World Corporation Limited 33.3% has been completed with field operations scheduled to recommence during September.

Based on the production testing completed to date at Le Chiffre 1, Klebb 1 and Davenport 1, a program has been designed to continue the evaluation of the productivity of the Patchawarra coals.

The program will comprise extended testing of the three wells completed to date plus the drilling of two close spaced offset wells around Klebb 1. This will enable the impact of fracture stimulation size on hydrocarbon and formation water production to be understood and facilitate optimisation of development economics.

Tags: Strike Energy Limited