Wärtsilä has signed a repeat integrated solution order with the Cosco (Qidong) Offshore Co.Ltd shipyard covering another DP3 Dynamically Positioned offshore accommodation rig being built for Singapore based Axis Offshore. The Wärtsilä solution includes the main power generation system, the propulsion system, the electric and automation system, and the automation safety system.
The vessel, which is expected to enter service in January 2016, will be equipped with a DP3 dynamic positioning system and will be available for worldwide operations. The dynamic positioning is a system that automatically maintains a vessel's position and heading by using its own propellers and thrusters.
Tags:
Wärtsilä Corporation
Comments on this page are closed.