Wärtsilä has signed a contract for a range of pumping solutions for a new Floating Storage Unit (FSU) which will operate on the Mariner oilfield in the North Sea. Wärtsilä's contract was signed in late 2013 with Samsung Heavy Industries (SHI) which will build the FSU in South Korea on behalf of Statoil, the Norway based international energy company. Delivery of the Wärtsilä equipment is scheduled for spring 2015, and the FSU is expected to be in operation in 2017.
The Wärtsilä scope of supply includes 45 deepwell process and cargo offloading pumps with electric motors and Variable Speed Drive (VSD) panels, three fire water pump skids, and two ballast pumps. The complete pumping packages have been designed to meet the customer's requirements regarding reliability and high system efficiency.
Tags:
Wärtsilä Corporation
Comments on this page are closed.