Wood Group has secured a front-end engineering and design (FEED) contract for the Woodside-operated proposed Browse floating liquefied natural gas (FLNG) Development.
Under a new 12 month contract awarded by Shell, Wood Group Kenny (WGK) will carry out flow assurance and process integration studies for the proposed development’s three offshore gas-condensate fields - Brecknock, Calliance and Torosa.
The Browse Joint Venture selected FLNG in conjunction with a subsea development as the preferred development concept for the Browse resources. An agreement has been executed with Shell to enable the proposed development to utilise Shell’s FLNG technology.
This is the third FEED contract WGK has secured for the proposed Browse FLNG Development, which is located 425km north of Broome, Western Australia. Earlier this month WGK announced a FEED contract award from Woodside (operator) to progress the configuration design of the flexible risers and umbilicals, and in July 2015, WGK announced a US$6 million contract to perform all design engineering for the development’s insulated production flowline system.
Tags:
Wood Group
Comments on this page are closed.