Scandoil.com

Winstar provides initial test results in Tunisia


Published May 26, 2010
[an error occurred while processing this directive]

Edit page New page Hide edit links

Winstar in Tunisia

Winstar provided initial test results of the 100% owned and operated Chouech Essaida 8S well (CS No.8S) in southern Tunisia.

•The Company announces that the well has been successfully completed and after 42 hours is currently flowing at a stable rate of 1,625 bbl/d of oil (2,200 boepd of total hydrocarbons) commingled from two zones in the Triassic reservoir. •The well results are consistent with results from interpretation of well logs which indicated that both productive zones encountered are 3 - 4 meters structurally higher and 50% to 100% thicker compared to the original CS No.8 well located approximately 50 meters west of the CS No.8S well. •The well is tied into the 100% owned central production facility ("CPF") and testing is being conducted via the existing gathering systems resulting in lower testing costs and the sales of all test oil production. •The following is a summary of the initial production rates from the well during 42 hours of initial testing

Tags: Winstar Resources Ltd.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home