Aker Solutions has been awarded a contract for eight steel tube umbilicals by Anadarko Petroleum Corporation for the Lucius field located in the Gulf of Mexico. The contract value is undisclosed.
The scope of work includes the project management, design, engineering, and manufacturing of two electro/hydraulic dynamic production umbilicals, two gas lift dynamic umbilicals, three electro/hydraulic infield umbilicals and one gas lift infield umbilical, including all associated ancillary equipment required for installation and interface with the existing development. These umbilicals will utilise the patented Aker Solutions PVC profile matrix, which provides both predictable estimates of fatigue and friction, and improved crush and impact resistance.
"This contract award is an excellent step towards our goal of supplying equipment for Anadarko across many product lines, including umbilicals," says Tove Røskaft, executive vice president of Aker Solutions' umbilicals business area.
Management, engineering and manufacturing of the umbilicals will be performed at Aker Solutions' facility in Mobile, Alabama.
Final deliveries will be made in Q3 2013.
The Lucius field is located in the Gulf of Mexico approximately 275 miles (442 kilometres) southwest of Fourchon, Louisiana in Keathley Canyon (KC) Block 874, 875 and 919, in a water depth of approximately 7 000ft (2 100 metres).
Aker Solutions' contract party is Aker Subsea Inc.
Tags:
Aker Solutions,
Anadarko Petroleum Corporation
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.