Tuscany Energy Ltd. has cased two more horizontal Dina oil wells, 92/16-16-39-27W3 and 93/16-16-39-27W3, located in the Evesham field, Saskatchewan. Tuscany is the operator and has a 60 % WI.
Both wells, which were drilled on 50 metre spacing, encountered porous sand and had good oil shows throughout the horizontal sections. The Company plans to have the two wells on production within 10 days.
Tuscany now has five horizontal wells in the Evesham Dina oil pool with an adjacent water disposal well. The Company anticipates a continuous development program through 2011.
Tags:
Tuscany Energy Ltd.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.