Scandoil  

Transerv Energy provides Warro drilling update


Published Aug 26, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Transerv Energy-2

Transerv Energy wishes to announce that at Warro-5, during the past week, 13 3/8' casing was run to a depth of 1573mRT TVD and the well subsequently drilled to a depth of 2388mRT MD (2364mRT TVD) in a 12 ¼ inch hole. The current operation is preparing to commence fishing operations to recover stuck pipe.

The 12 ¼ inch section of the well is being drilled directionally at an angle of approximately 18 degrees to reach a subsurface location 500m to the west of the well surface location. The surface location was chosen to avoid clearing of native vegetation directly over the sub surface target.

Tags: Transerv Energy




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml