Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/tlou-energy-achieve-peak-gas-flow-of-395000-cfpd-a.shtmlTlou Energy achieve peak gas flow of 395,000 cfpd at Selemo PilotTlou Energy provides an update on the results of gas flow testing at the Selemo Pilot. The Company initially began to flare gas
[an error occurred while processing this directive]
Edit page New page Hide edit links Tlou Energy provides an update on the results of gas flow testing at the Selemo Pilot. The Company initially began to flare gas at Selemo in November 2014 with the rate building as the well bore environment was gradually brought into equilibrium with atmospheric conditions. A decision was made in early December 2014 to determine the gas flow potential of the well by conducting short term tests as part of the longer term testing process. Testing operations will continue at the four pilot locations, currently in various stages of gas and water production, to advance ongoing gas sales agreement negotiations and reserve certification. These activities will serve to underpin Tlou Energy's planned field development objectives at the Lesedi CBM Project in Botswana. |