Scandoil  

Titan Energy announces preliminary success in initial test on Allen Dome


Published Apr 21, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Titan Energy Ltd

Titan Energy Ltd is pleased to announce preliminary success in the initial test of the 2015 developmental drilling program on Allen Dome.

JT Reese #14 preliminary evaluation results

After encountering numerous oil shows during the drilling process, the JT Reese #14 has reached a Total Depth of 4,390 feet and has been logged to a depth of 3,950 feet. Preliminary results and highlights of the test are as follows: •The dual induction triple combo log on the Reese #14 down to 3,950 feet indicates a minimum of eight prospective oil bearing pay zones beneath the overhang down to the bottom of the logged interval. •This result is based upon extensive log analysis and correlation with producing zones inpreviously produced offset wells from the 1920's through the 1980's. •The Company successfully drilled through over 1,300 feet of cap rock and overhang asanticipated in the drilling plan. •The well has been drilled to a total depth of 4,390 feet. Based upon correlation with previously drilled wells, the Reese # 14 has encountered all formation targets, which formed the objective of the well. •There was no loss of circulation encountered while drilling through the overhang dome material or below. This is the first well since 1978 on the dome that has successfully done so. •The logging tools sat down on a sand bridge at 3,950 and were unable to log the lower interval from 3,950 to 4,390 feet.

Tags: Titan Energy Ltd




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml