Scandoil  

Terrace Energy reports initial results of first well


Published Feb 22, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Terrace Energy Corp

Terrace Energy report early results from its first horizontal well on its recently acquired STS Project in Texas.

The well was drilled to a measured depth of 13,302 feet, including approximately 4,100 feet of horizontal section, and was successfully fracture stimulated in 14 stages.

After less than 10% load recovery, the well continues to strengthen and is currently flowing at a rate of approximately 564 BOPD (barrels of oil per day) and 1.2 MMCFD (million cubic feet per day) of liquid rich gas. There can be no assurance that the flow rate will stabilize at current or higher levels over time.

Dave Gibbs, the Company's President, commented: "We are very pleased with the results at this early stage of the project's development. The current flow rate of our first well is greater than anticipated, which bodes well for the long-term successful development of our acreage position."

Tags: Terrace Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml