Scandoil  

Technip Awarded Logistic Base Contract Extension


Published Apr 28, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Technip-7

Technip has signed a 4-year extension of its 5-year initial contract signed in January 2011 with Petrobras S.A. for its Flexible Pipes Logistic Base (BAVIT), located in Vitória, Brazil.

The scope covers storage, handling, inspection, testing, load-out (two simultaneous vessel load-out points), internal cleaning and maintenance of flexible pipes. The base has a 300-tonne handling capacity, storage capacity for 220 reels and serves as the main load-out point for all pre-salt flexible pipes.

Adriano Novitsky, President of Technip in Brazil, comments, “Technip is very proud of this contract. In 2016, the logistic base has reached the significant milestone of eight years of operation without lost time injury. This achievement demonstrates that the culture of HSE has become sustainable and the renewal of this contract is a demonstration that we have been performing as expected by our client, ensuring high standards of quality and safety in the operations.”

Tags: Petrobras, Technip




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml