Technip has been awarded a contract by Anadarko Petroleum Corporation for the K2 Riser Base Gas Lift project, located in Green Canyon 608 in the Gulf of Mexico, at a water depth of approximately 1,300 meters.
This contract covers: • project management and engineering, • design, fabrication, and installation of two PLEMs and four PLETs, • installation of flowline, jumpers and associated terminations and hardware, • installation of one free issued dynamic umbilical with SUTA(1) and flying leads, • pre-commissioning of the flowline and umbilical gas lift system.
Technip's operating center in Houston, Texas, USA, will conduct the overall project management. The offshore installation is expected to be performed in the second half of 2015 by Technip’s Deep Blue, one of the world's largest purpose-built ultra deepwater pipelay and subsea construction vessels.
Tags:
Technip
Comments on this page are closed.