Strike Energy Limited provide an update regarding fracture stimulation and flow back operations at the Le Chiffre 1 and Klebb 1 wells.
The second stage of the frac program at Klebb in the thick Patchawarra Vu Upper seam was redesigned to be less than 10% of the size of the stage pumped in Le Chiffre as a result of the unexpectedly high permeability and productivity observed at Le Chiffre.
Tags:
Strike Energy Limited
Comments on this page are closed.