Scandoil  

Strike Energy successfully recommissions Klebb 1 well


Published Nov 11, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Strike Energy Limited-4

Strike Energy Limited is pleased to provide an update on operations at its Southern Cooper Basin Gas Project in PEL 96 (Strike 66.67% and Operator, Energy World Corporation 33.33%).

Klebb 1 workover

Workover operations at Klebb 1 to replace the downhole pump unit were successfully completed on the 2 November with flow testing recommencing on the 3 November. The pump has been operated at a low rates of around 80 bwpd with no downtime and gas production measured within days of recommencement of testing.

The forward plan at Klebb 1 is to continue pumping operations with incremental water production rate increases used to gradually reduce bottom hole pressure and manage building gas production.

Tags: Strike Energy Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml