Strike Energy Limited provides an update on its continuing flow testing program at its Southern Cooper Basin Gas Project in PEL 96 (Strike 66.7% and Operator, Energy World Corporation (33.3%).
Flow Testing update
Following the recommencement of flow testing operations after the recent rain delays, gas production has continued to increase at both the Le Chiffre 1 and Klebb 1 locations. The wells have now been cycled through a series of production and shut in phases to obtain a range of flow and pressure data.
Tags:
Strike Energy Limited
Comments on this page are closed.