The directors and management of Strata-X Energy Ltd. are pleased to announce that the Company has reached a total depth of 6,762 in the Burkett 5-34HOR well. The revised lateral length of approximately 1,824 feet was drilled through the targeted Lingle formation. While drilling the lateral portion of the well, oil and gas shows were encountered and live oil was visible in the drilling mud.
The next stage is to set a liner through the lateral section using mechanical packers and a sliding sleeve completion system. Once the liner has been set the drilling rig will be moved off location. As indicated on Slide 16 of the Vail Primer, the Company will conduct a breakdown and pressure test to obtain definitive reservoir data. This pressure data together with rock mechanics data derived from the core taken in the vertical stage, will be used to finalize the stimulation design for the well.
Tags:
Strata-X Energy Ltd.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.