Scandoil  

Statoil shuts down production on Troll C platform due to pipeline corrosion


Published Aug 22, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

The Troll C platform in the North Sea

Statoil shut down production on the Troll C platform in the North Sea on Sunday 17 August after an inspection programme on the platform detected corrosion damage to a pipe connected to the oil export system.

The corroded pipe will be replaced. This is expected to require a seven-day shutdown.

Troll C has a daily equity production of some 58,000 barrels of oil, and exports 8 million cubic metres of gas. In addition some 34,000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Tags: Statoil




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml