Scandoil  

Statoil declares temporary shutdown on Troll C


Published Nov 19, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Troll C-3

Production on the Troll C platform in the North Sea has been temporarily halted pending further investigation of corrosion found in the auxiliary system for gas treatment.

During a scheduled inspection on the platform corrosion was discovered on a tank in the glycol system, which is an auxiliary system for treating gas on the platform.

A similar tank in a parallel gas treatment system is currently being checked.

Troll C production has been temporarily stopped pending the investigation results.

An expert team has been formed to determine further action and work scope.

Troll C has a daily production of around 120,000 barrels of oil and 10.5 million cubic metres of gas. The Fram licence owns 50.000 barrels of the oil and two million cubic metres of the gas.

Tags: Statoil




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml