Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/spot_news/technip-awarded-a-substantial-contract-to-supply-f.shtmlTechnip awarded a substantial contract to supply flexible pipes for the Libra fieldTechnip was awarded a substantial contract from Libra Oil & Gas BV, a consortium led by Petrobras Netherland BV (40%) and partners: Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%).The project includes the supply of flexible pipes for the Libra Extended Well Test field, located in the Santos Basin pre-salt area, Brazil. This is one of the first steps of the Libra giant field development.
[an error occurred while processing this directive]
Edit page New page Hide edit links Technip was awarded a substantial contract from Libra Oil & Gas BV, a consortium led by Petrobras Netherland BV (40%) and partners: Shell (20%), Total (20%), CNOOC (10%) and CNPC (10%). The project includes the supply of flexible pipes for the Libra Extended Well Test field, located in the Santos Basin pre-salt area, Brazil. This is one of the first steps of the Libra giant field development. This contract covers the supply of high-end flexible pipes including: 8' oil production, 6' service and 6' gas injection flexible pipes. Designed to produce the first Libra field oil, they are the first 8'' oil production pipes to be installed in pre-salt area. This demonstrates Technip's technological leadership and reinforces flexible pipes suitability for the ultra-deepwater and fluid harsh conditions of Brazilian pre-salt fields. Technip's operating center in Rio de Janeiro, Brazil, will perform the project management and engineering. The highly technological flexible pipes will be produced at Technip's manufacturing sites in Vit?ria and Açu, Brazil. Delivery is scheduled to start in the second half of 2016. Adriano Novitsky, President of Technip in Brazil, commented,'Technip is very proud to have been selected to supply the first pipes for the Libra development. It is the result of strong R&D and engineering efforts to overcome the pre-salt technical challenges using flexible pipes solution.' |