Scandoil  

Sound Oil reaches next casing point at second Nervesa well


Published May 12, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Sound Oil-2

Sound Oil says that the second Nervesa well has now been drilled (through the Conglomerati del Montello formation to the top of the Marne di San Donà formation) to the next casing point at a measured vertical depth of 1,295 metres.

Operations are now in progress to install the 9 5/8' casing.

The well is therefore now approximately 200 metres above the first reservoir objective.

Tags: Sound Oil plc




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml