Scandoil  

ShaMaran declares results of Chiya Khere-5 development well tests


Published Aug 11, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

ShaMaran Petroleum Corp.

ShaMaran Petroleum Corp. is pleased to announce the successful testing of the Chiya Khere-5 development well in the Atrush Block in the Kurdistan Region of Iraq.

The Chiya Khere-5 development well was drilled and suspended in May and June, 2014. The well was re-entered in May 2015 and three well tests ('DST') using an electrical submersible pump were carried out. •DST#1 was conducted over a 24-metre interval in the Mus Formation. The interval tested at an average oil rate of 750 bopd (barrels of oil per day) with a final water cut of less than 1 percent. Oil gravity was measured at 16 degrees API. •DST#2 was conducted through 60 meters of perforations within a 118 metre interval in the Sargelu Formation. The interval tested at an average oil rate of 5,000 bopd with a constrained drawdown during the main test period. There was no water cut at the end of the test. Oil gravity was measured at approximately 25 degrees API. •DST#3 was conducted over a perforated 12 metre interval within the Naokelekan Formation. The interval tested at an average rate of 1,600 bopd with a measured oil gravity similar to DST #2.

The work-over rig has now moved to the adjacent CK-8 development well and commenced testing operations.

Tags: ShaMaran Petroleum Corp




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml