Scandoil  

Senex Energy to plug and abandon Hathi-1 exploration well


Published Sep 29, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Senex Energy Limited-3

The following provides an update to the Hathi-1 exploration well located within PEL 514 in the South Australian Cooper Basin.

Spud Date: 13 September 2014 Planned Total Depth: 2,530 metres (subsea) Current Depth: Total depth of 2,568 metres (MDRT*) reached at 0015 hours on 24 September 2014 Operations: Wireline logs complete, trace hydrocarbons, preparation for plug and abandon Participating Interest: Senex Energy Limited 80% (Operator) Planet Gas 20% (free carried)

Forward Program

The EDA #4 rig will now move for the drilling of the Bagheera East-1 well.

The vertical exploration well is located in the northwest of PEL 514 situated approximately 10 kilometres northeast of Hathi-1. The Telopea Field and the Keleary Field are located 13 kilometres and 10 kilometres respectively southeast of Bagheera East.

Tags: Senex Energy Limited




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml