Scandoil  

Semi-Submersible Rig Stena Don Arrives at Semco Maritime Hanøytangen


Published Nov 18, 2016
[an error occurred while processing this directive]

Edit page New page Hide edit links

Semco Maritime - Stena Don
Stena Drilling has selected Semco Maritime’s facilities at Hanøytangen for a warm stacking of the offshore drilling rig Stena Don (photo: Semco Maritime)

Stena Drilling has selected Semco Maritime’s facilities at Hanøytangen for a warm stacking of the offshore drilling rig Stena Don. The rig will be warm stacked at the Hanøytangen yard in Bergen, ready for future work, explains Business Development Manager Øistein Tømte, Semco Maritime.

Stena Don arrived at the yard 16 November and has previously been on a contract in the Troll field in the Norwegian sector of the North Sea.

Stena Don is a class 3 semi-submersible rig built in 2001, and has recently been upgraded with a modern equipment package. The harsh environment rig is suitable for drilling, completion and workover operations worldwide.

“Hanøytangen’s facilities include both wet dock and dry dock, which are tailored for assignments such as this where a rig arrives for a brief stopover, a Compliance Renewal survey or large-scale upgrade work before returning to operations,” says Øistein Tømte.

The well-equipped dock facilities at Hanøytangen comprise several dock areas, including a dry dock of 116x125 meters and quay areas with depths of at least 100 metres. The dockyard is fitted with modern equipment for repair and handling of rigs, rig gear and other very large elements on water and land, including crane capacity at all docking areas.

Tags: Semco Maritime AS, Stena Drilling




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml