Savanna has entered into a contract with a large U.S. based, multi-service provider to deploy four existing rigs from its Canadian/U.S. fleet into the Chicontepec region in central eastern Mexico. The rigs are contracted to work at a utilization rate of 100% for an initial term of 18 months, with an extension option.
The rigs to be supplied under this agreement are mid-depth telescoping double drilling rigs, representing the core conventional platform within Savanna. The rigs will require minor modifications to allow them to work effectively in the Chicontepec region, such modifications and additional equipment expected to total less than $6 Million.
The rigs are expected to be operational in Mexico by mid-August, 2009. All costs relating to mobilization of the rigs into Mexico from the U.S./Mexico border will be borne by the operator. Similarly, demobilization of the rigs, if any, will result in delivery of the rigs to the U.S. as well.
Tags:
Savanna Energy Services Corp.
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.