San Leon announce preliminary results for the hydraulic fracture treatment performed on the Rogity-1 well on the Braniewo S Concession in Poland's northern Baltic Basin. This was the first frac of a three-stage programme at Rogity-1 as part of the recently signed farm-out agreement ("FOA") with Wisent Oil & Gas plc ("Wisent"), under which Wisent will fully design, perform, and fund the costs of the programme as well as any subsequent testing in the well.
As set out in the Company's announcement on 5th August 2013, the objective of this first fracture was to understand the frackability and production potential of the tight Cambrian sandstones. It is anticipated that any future development would be with multi-staged fracced long offset horizontals. San Leon has mapped a large Cambrian structure at the Rogity-1 well, which the Company is analysing as a sweet spot for oil production via fractures.
Tags:
San Leon Energy
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.