Scandoil  

Rolls-Royce enhances role in Brazil with $651m Petrobras contract


Published Dec 1, 2011
[an error occurred while processing this directive]

Edit page New page Hide edit links

Petrobras-7

Rolls-Royce has been awarded new contracts with a potential value of $651 million by Petrobras to support its production activities offshore Brazil.

Rolls-Royce will supply Petrobras with thirty-two (32) RB211 gas turbine power generation packages, including waste-heat recovery units, to meet the power generation requirements of eight (8) separate Floating Production Storage and Offloading (FPSO) vessels. The FPSO’s, used for the processing of hydrocarbons and storage of oil, will operate in the petroleum rich Lula (formerly Tupi) and Guará oilfields, located in the pre-salt area of the Santos Basin off the coast of Brazil.

The new gas turbine power generation packages will be delivered in groups of four, with the first units scheduled for delivery in the first quarter of 2013. Four gas turbine generating sets will be installed on each of the eight FPSO’s. To ensure that the FPSO vessels operate at peak performance levels, Rolls-Royce will also provide Petrobras with long-term services, technical support and training.

Andrew Heath, President – Energy, Rolls-Royce said: “We are delighted that Petrobras has again selected Rolls-Royce power generation technology to help meet its aggressive offshore oil and gas production objectives. Rolls-Royce has a strong record of equipment and services supply to Brazil’s energy sector and we are committed to supporting all our customers in the country with reliable, technology solutions and a strong localised presence.”

Francisco Itzaina, Regional Director – South America, Rolls-Royce said: “Rolls-Royce is committed to continuing to expand its technology presence and manufacturing capabilities in Brazil, and to stimulate the local economy through job creation, skills development and training. To fulfil these contracts we will further develop our local supply chain to provide critical components required for our gas turbine power generation equipment.”

In February Rolls-Royce announced plans for the construction of a new $100 million purpose-built gas turbine assembly and test facility in Santa Cruz in the state of Rio de Janeiro which is expected to become operational in the first quarter of 2013. Equipment from these contract awards, scheduled for installation in the Lula (Tupi) and Guará oilfields, will be among the first units to be assembled and tested at the new Rolls-Royce facility.

Tags: Petrobras, Rolls-Royce




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml