Scandoil  

President Energy provides Argentina operational update


Published Jul 30, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

President Energy

President Energy provides an update on the hydraulic stimulation programme on old shut in wells PE-7 and PE-8 at the Pozo Escondido field in the Puesto Guardian Concession (President 50% interest).

PE-7 Well

The PE-7 well is in the process of being cleaned up. The well which has been shut in for 27 years is currently demonstrating good flow rate potential in line with our expectations, and is swabbing at gross flow rate of liquids (oil and injection water) of 230bopd. The oil cut is presently 30-40% per cent and continues, as expected, to increase steadily as the injection water continues to be cleaned up. This production is only from the carbonate zone where no reserves are presently booked.

After completing the clean-up, the forward plan is a re-perforation of the deeper A6 sands with the well to be produced from both sections. Earlier well surveys have demonstrated that reservoir pressure is near original.

Tags: President Energy




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml