Scandoil.com

Pioneer reports three new discoveries in Tunisia


Published Oct 19, 2007
[an error occurred while processing this directive]

Edit page New page Hide edit links

Pioneer expands drilling program and increases production growth targets-Spotlight

Pioneer Natural Resources has seen continued success in its development and expansion programs in Tunisia.The company has a substantial acreage position in the Ghadames Basin of southern Tunisia with an interest in five blocks totaling 3.9 million acres.

Since mid-July, Pioneer has drilled two new operated discoveries on the Jenein Nord Block, Angham and Methaq. Testing has been completed on the Angham well and the Farrah discovery well announced in July. The cumulative rates from individual tests on multiple oil-bearing zones in the two wells totaled approximately 5,000 barrels of oil per day (BOPD). The Methaq well is expected to be tested in November.

With a total of seven discoveries on the Jenein Nord Block since late 2006, Pioneer is constructing production facilities which are planned to have an initial gross capacity of 10,000 BOPD and be expanded to 20,000 BOPD during the second half of 2008. With continued drilling success, the facilities will be capable of being further expanded beyond 20,000 BOPD. Pioneer plans to begin connecting the seven Jenein Nord discoveries to these facilities in late 2007. As the discoveries are tied in, gross production will gradually ramp up during 2008 and is expected to reach 15,000 to 20,000 BOPD by year end. Pioneer will hold a 50% interest in the resulting production concession, assuming that ETAP participates at the maximum 50% level pursuant to the relevant agreements.

In the Adam Concession, Pioneer has participated in 15 wells since 2003 with greater than 90% success. The Company holds a 20% interest in the Concession, and the remaining interest is held by Eni (Operator), Talisman and ETAP, the state oil company. Evaluation has been completed on the Nadir 1 well, a recent new field discovery in the Concession, where four of the six oil-bearing sections in the well tested at an individual zone cumulative rate of approximately 4,000 BOPD. Facilities are in place to commence production from the well by the end of October.

Pioneer and the other participants have acquired approximately 1,450 square kilometers of 3-D seismic to optimize the drilling programs on the Adam, Jenein Nord and Borj El Khadra blocks and plan to acquire an additional 1,900 square kilometers over the next year. Since the 3-D seismic acquisition began, Pioneer has had 100% success in exploration drilling and has identified more than 30 prospects and leads, some with resource potential as large as 25 million barrels oil equivalent. Pioneer plans to spud three additional wells in Tunisia over the remainder of 2007 and 15 to 19 wells during 2008.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home