Scandoil  

Petrotech begins selling gas from their 4 producing wells on the Nowata lease


Published Feb 11, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Petrotech Oil and Gas

Petrotech Oil and Gas have completed the following work on the Brown lease. All of the lease roads, the tank battery, and well sites have been rebuilt and graveled allowing for all weather access. All of the electrical has been examined, and either repaired, and or replaced.

The disposal well was tested and a manual Integrity Test (MIT) completed for state inspection, and a triplex injection pump was installed to begin disposing of the wastewater. Several leaks were located in gas gathering line to wells, metering/sales point all were repaired, and We have begun selling gas. We have rebuilt five wells and currently have a disposal well and four gas wells producing over 40 MCF per day.

Tags: PetroTech Oil and Gas Inc.




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml