Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/petronas-floating-lng1-reaches-a-95-overall-progre.shtmlPETRONAS Floating LNG1 reaches a 95% overall progressThe PETRONAS Floating LNG1 (PFLNG1) has reached a 95% overall progress in its construction and will come on stream in 2016.
[an error occurred while processing this directive]
|