Scandoil  

Petroamerica provides a testing update on Las Maracas-5 well


Published Nov 19, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Petroamerica Oil Corp

Petroamerica Oil Corp. provide the results of ongoing testing operations at its Las Maracas-5 well (the "well"), which flowed approximately 3,700 barrels of oil per day (bopd) from the middle Gacheta sand only. This rate does not include production from the lower Gacheta sand.

The middle Gacheta sand, which produces in the Las Maracas-3 and Las Maracas-4 wells, was flow tested in the Las Maracas-5 well and produced 30 degree API oil from a 6-foot perforated interval at maximum rate of 3,762 bopd under natural flow conditions, with a watercut of 0.1% at the end of the test. The well was tested over a 13 hour period and had to be choked back due to storage capacity limitations at the well site. The well will now be completed as a Gacheta producer following which the Tuscany 109 rig is expected to be skidded to drill the Las Maracas-6 well.

The Las Maracas field is situated in the Los Ocarros block, Colombia, where Petroamerica holds a 50% participating interest.

Tags: Petroamerica Oil Corp




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml