Scandoil  

Pacific Energy Development completes drilling of Loomis 2-6H well


Published Oct 9, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Pacific Energy Development-2

Pacific Energy Development has successfully completed the drilling of the Loomis 2-6H well, the third well of a three well-pad drilling program on its Wattenberg Asset that began in August 2014.

The drilling of the first two wells, the Loomis 2-1H and Loomis 2-3H, was completed in September.

The Loomis 2-6H well reached a total measured depth of 11,335 feet, with a 6,297 foot total vertical depth and 4,200 foot completed lateral length through the Niobrara "B" Bench, with Niobrara "B" Bench chalk present across the entire well bore with a thickness of approximately 45 feet, and drill cuttings from the well bore evidencing highly prolific oil rich shale reservoir rock.

Tags: Pacific Energy Development




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml