Scandoil  

Pacific Energy commences initial production rate testing of Loomis wells


Published Jan 9, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

Pacific Energy Development-2

Pacific Energy Development has commenced testing to determine the initial production rates of the Company's 3 new horizontal Loomis wells recently drilled and completed on a 3-well pad in Weld County, Colorado.

Since completion, the three Loomis wells -- the Loomis 2-1H, Loomis 2-3H and Loomis 2-6H -- have been on flow-back. With recent sub-zero temperatures in Eastern Colorado, the flow-back was temporarily reduced or halted at times.

Through the use of heaters coupled with higher outside temperatures, the Company has now resumed flow-back and is commencing initial production rate testing of these wells.

Tags: Pacific Energy Development




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml