Scandoil.com

Otto flows gas from Kuzey Arpaci-1


Published Jun 5, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Otto and Incremental provides drilling report for the Edirne Licence, Thrace Basin, Turkey-Spotlight

Joint venture partners Otto Energy and Incremental Petroleum says that the Kuzey Arpaci-1 well has tested at excellent flow rates from a tested section of only 5m in the lower reservoir.

Highlights

• Kuzey Arpaci-1 flowed dry gas at a rate of 1.15 MMscf/d over the interval 462.8m to 467.5m at a stabilized rate of 1.15 MMscfg/d through a ½'bd inch choke. • Another, shallower reservoir section is also present in this well and will be available for future production. • This is the second confirmed commercial flow rate from the Edirne discovery wells.

Following the shut in period additional perforations will be added and the well will be flowed again and prepared as a future production well.

The rig will then move to test the Arpaci 1 well, which was drilled in January 2006, before the 3D seismic was available.

The partners in the Edirne Gas project are Otto Energy 35% and Joint Operators Incremental Petroleum (55%) and Petraco Energy (10%).

Tags: Incremental Petroleum, Otto Energy Limited




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home