GPC, operator of the Galoc oil field offshore the Philippines, advised that oil production has resumed following the temporary suspension necessary due to a delay in offloading crude oil from the FPSO.
Production resumed on Monday, November 9th. Offloading is ongoing as a routine operation with crude oil being transferred from the FPSO to the off-take tanker following replacement of the floating export hose.
The Galoc field is located in Service Contract SC14-C (Galoc Sub Block) in 290m of water approximately 65km north west of Palawan in the Republic of the Philippines.
Tags:
Otto Energy Limited
Add a Comment to this Article
Please be civil. Job and promotion will not be added into the comment page.