Ophir Energy announces that drilling operations have now concluded on the Mlinzi Mbali-1 well in Block 7, Tanzania. Ophir has an 80% net interest.The well was located c.210km east of Dar es Salaam and was drilled by the Deepsea Metro I drillship.
Mlinzi Mbali-1 is the first well on Block 7 and targeted a structural crest within a Lower Cretaceous channel complex, with secondary targets in the Upper Cretaceous and the Jurassic. The Cretaceous targets were intersected and are interpreted to be water bearing. The well was completed ahead of time and budget.
The Deepsea Metro I drillship will now be released to BG Group to drill an exploration well in Kenya. It will then return to Tanzania where wells are planned on Block 1 and on Ophir's operated East Pande Block during the first half of 2014.
Tags:
Ophir Energy
Comments on this page are closed.