Scandoil.com

Oilex reports Cambay-74 oil well onstream, India


Published Dec 1, 2008
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex provides India operations report

Oilex reports that the Cambay-74 oil production well has been brought onstream following a brief test program.

During that test, the well flowed at an average stabilised rate of 542 barrels of oil per day (bopd) on 6.3mm choke with an average of 280 cubic feet of gas per barrel of oil (GOR 280) at a flowing tubing pressure of 722 psi.

Together with Cambay-64, the combined near-term flow rate is expected to be in the range of 500 -800 bopd again dependent upon immediate storage and transportation limitations.

Cambay-64 workover well has continued to produce oil with no water from the Miocene MBS reservoir at rates of 180 - 300 bopd constrained by available storage tank capacity. The well tested 380 API oil from a perforated interval of 2 metres at an average rate of 310 bopd on 5.6 mm choke at a flowing tubing pressure of 660 psi.

Participants in the Cambay Production Sharing Contract are: Oilex Ltd (Operator) 30% Oilex NL Holdings (India) Limited (100% owned by Oilex Ltd) 15% Gujarat State Petroleum Corporation 55%

Tags: Oilex




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home