Scandoil  

Oilex recommenced Fracture Stimulation Operations


Published Jul 7, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex - Cambay-77H Well

Oilex Ltd says that Fracture Stimulation Operations (Frac Ops) have recommenced following repairs to the frac tree. As a precaution, mobilisation of a spare frac tree has commenced and it will standby at Cambay-77H site, as all the spare valves have been used for these repairs.

Stage 2 fracture stimulation (frac) has been successfully completed, including a data frac. The well response to stimulation was similar to the Stage 1 frac. As previously reported, subsequent to Stage 1 activities, gas was detected at surface and elevated overpressure of ~5,000psi was measured indicating a pressure increase of 670psi. The original reservoir pressure of ~4,330psi was interpreted from the micro frac programme. No decrease in the elevated overpressure has been noted subsequent to the recommencing operations.

Tags: Oilex Ltd




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml