Scandoil  

Oilex provides update on the Cambay-77H well


Published Apr 9, 2014
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex - Cambay field

Oilex Ltd announce that Cambay-77H well drilling operations successfully completed setting and cementing the 9 5/8 inch casing at approximately 1,653m Measured Depth (MD).

The casing was set in a suitable formation to ensure well integrity whilst drilling the anticipated over-pressured target reservoir section. An integrated stress test of the rig systems was successfully completed to ensure operational integrity prior to drilling the final ~ 26m of the intermediate hole section and setting casing. The condition of the wellbore subsequent to the rig repair period was found to be very good.

The rig is currently preparing to drill ahead in 8 ½ inch hole into the target reservoir section. Elevated gas readings are anticipated through the target formation to Total Depth (TD).

Tags: Oilex Ltd




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml