Scandinavian Oil-Gas Magazinehttp://www.scandoil.com/moxie-bm2/news/oilex-provides-update-on-cambay-77h-well.shtmlOilex provides update on Cambay-77H wellOilex Ltd is pleased to announce that all the drilling services tenders have now been evaluated and successful contractors
[an error occurred while processing this directive]
Edit page New page Hide edit links Oilex Ltd is pleased to announce that all the drilling services tenders have now been evaluated and successful contractors are preparing to mobilise. Assembly of the Essar LR-4 rig has commenced and components continue to arrive from Mumbai. The estimated spud date window is 22 February to 9 March 2014. The Cambay-77H well will evaluate the production potential of the extensive Eocene "tight" Y Zone reservoir that extends across the 161 km2 Cambay PSC contract area. The well, which includes a 350 metre lateral section with 8 fracture stimulations to test the deliverability of the Y zone. Services associated with fracture stimulation and production testing are currently being finalised. |