Scandoil.com

Oilex provides drilling operations updates


Published Oct 24, 2007
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oilex commences Pendalian-3 drilling

Oilex says that the 81/2” hole at Pendalian-3 has been drilled to the planned total depth (TD) of 748 metres and wireline logging is being carried out.

Preliminary indications while drilling are that the target Sihapas sands were intersected as expected with a number of potential oil zones indicated at depths similar to the nearby Pendalian-1 well. Once the logging program has been completed, the well will be cased and a comprehensive 14 day multi-zone testing program undertaken.

India – Bhandut PSC – Bhandut-2Z:

The Bhandut-2Z sidetrack well has been drilled to the planned core point at a measured depth of 1024.8m and a 9m core has been cut that will provide porosity, permeability and oil saturation information over the target “G” sand potential oil reservoir.

Preparations are under way to resume drilling to TD (1,083m), at which point wireline logs will be run. Based on the wireline log interpretation, consideration will be given to testing the well and if successful, the most appropriate approach to completing the well for production.




   

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us

 

sitemap xml


 

Home