Scandoil  

Oando Energy Resources resumes production from the Ebendo field


Published Dec 31, 2012
[an error occurred while processing this directive]

Edit page New page Hide edit links

Oando Energy Resources Inc.

Oando Energy Resources Inc. provided an update regarding the damaged 10 inch Kwale-Akri oil delivery pipeline that is operated by Nigerian Agip Oil Company Limited (NAOC) and connects OER's Ebendo Field (OML 56) to the Brass export terminal (as previously disclosed on November 12, 2012).

The Kwale-Akri pipeline has been fully repaired and has commenced operations with reduced volumes being injected into the pipeline for testing, to ensure full integrity before full volume capacity is attained. Gross production from the Ebendo Field (OML 56) has recommenced at approximately 2,000 Barrels Per Day (bbls/day), (900 bbls/day net to OER) with a gradual ramp-up to full gross production of 4,000bbls/day expected over the next several weeks, as full pipeline integrity is confirmed.

Tags: Oando Energy Resources Inc.




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml