Scandoil  

NPD grants start-up consents for Edvard Grieg and Utsira High pipelines


Published Nov 9, 2015
[an error occurred while processing this directive]

Edit page New page Hide edit links

NPD grants start-up consents for Edvard Grieg and Utsira High pipelines

The Norwegian Petroleum Directorate has granted start-up consents for the Edvard Grieg oil pipeline and the Utsira High gas pipeline.

These transport solutions will become part of the development of the Edvard Grieg and Ivar Aasen fields on the Utsira High in the North Sea. Start-up of the Edvard Grieg field is planned towards the end of 2015, whereas the planned start-up of Ivar Aasen is scheduled for next year. Ivar Aasen will use both pipeline systems.

The oil transport system includes a 43-kilometre long 28-inch pipeline between the Edvard Grieg platform and a new Y-connection point, which has been installed on the Grane oil pipeline about 4 kilometres from Grane.

The gas transport system includes a 94-kilometre long 16-inch pipeline from the Edvard Grieg platform to an underwater connection point (T-connection) on the Beryl pipeline. This, in turn, is connected to the Scottish Area Gas Evacuation (SAGE) pipeline in the UK sector.

Tags: Norwegian Petroleum Directorate




Advertisment:

Comments on this page are closed.

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml