Scandoil  

Norwest' Arrowsmith-2 Carynginia formation flows at 350,000 scf/day


Published Feb 20, 2013
[an error occurred while processing this directive]

Edit page New page Hide edit links

Norwest Energy NL

Norwest Energy NL advises that flow-back and testing of primary shale gas target, the Carynginia Formation has now commenced in the Arrowsmith-2 well, and early results are promising, with a maximum gas rate of ~350,000 standard cubic feet per day (scf/d) recorded on several occasions since the well commenced flow-back on Friday 15.

The Carynginia Formation only had a limited period of flowback in the original 2012 hydraulic fracture stimulation program due to a tight operational timeline, and as a result there is still a significant percentage of the frac fluid remaining on the formation. Despite this, the Carynginia is demonstrating a strong early gas rate from this zone; a very encouraging sign.

Tags: Norwest Energy NL




Advertisment:

Add a Comment to this Article

Please be civil. Job and promotion will not be added into the comment page.

(Use Markdown for formatting.)

This question helps prevent spam:

+ Larger Font | + Smaller Font
Top Stories

 

 

 

 


 


RSS

RSS
Newsletter
Newsletter
Mobile News
Mobile news

Computer
Our news on
your website


Facebook
Facebook
Twitter
Twitter

Contact
Contact
Tips
Do you have any
tips to us
Stats

 

sitemap xml